Main Building reopens with standard hours on May 10
Starting on Monday, May 10, all of the entrance doors to the Main Building that face the ATLC and the Health Professions Building will be unlocked from 6 a.m. to 10 p.m. on all days the College is “open for business.”
These are the same access times currently in effect for other Clifton Campus buildings.
- College Drive will remain closed (except for the portion that provides access from Central Parkway to parking lots A and D) until repairs to the fire loop and other remaining repairs to Main are completed.
- Main Building doors on the “flagpole” side of Main (center left in the photo above) will be open only for use by construction personnel, from 6 a.m. to 6 p.m. daily.
- Signage will be in place to guide students, employees, and visitors who may need access to Main.
For Summer Semester, all parking on Clifton Campus is free and the gates will be open for all garages and parking lots.
- Students with Summer classes in Main Building will continue to have access to Lots A and D if they wish to use these parking areas.
Hours of operation for academic division offices and other services in Main will be available next week.